The Ultimaker S5 can work as a standalone unit, or in combination with either one or both of its peripherals - the Ultimaker S5 Air Manager and the Ultimaker S5 Material Station. The Ultimaker S5 Pro Bundle is built up from all three devices.
This page describes how to install the complete Ultimaker S5 Pro Bundle. The installation consists of four main sections:
Tip: We recommend removing the packaging of the Ultimaker S5 and Material Station with the box placed on the floor for safety. Please retain all packaging for warranty purposes.
Caution: Choose a suitable location to place the Ultimaker S5 Pro Bundle. Install the products on a flat, stable surface that is capable of carrying the weight of the total system (~ 50 kg / 110 lbs). Take proper measures to prevent the Pro Bundle from falling.
Installing the Ultimaker S5
Tip: It is recommended to first install the Ultimaker S5 hardware accessories before mounting the printer on top of the Material Station for easier access to all components.
![]() |
![]() |
|
|
![]() |
![]() |
|
|
![]() |
![]() |
|
|
Tip: The Ultimaker S5 also comes with a spool holder. This is not needed for the Ultimaker S5 Pro Bundle. You can install the cap from the Material Station accessories in the hole for the spool holder in the back panel of the Ultimaker S5 instead.
Installing the Material Station
Next, unbox the Material Station by removing the plastic locking clips at the bottom of the box. Holding the handles, lift the upper section of the box. Place the foam pieces, documents, and accessories aside.
Caution: The Ultimaker S5 must be lifted by at least two people during installation.
![]() |
![]() |
|
|
![]() |
![]() |
|
|
Installing the Air Manager
Start unboxing the Air Manager by removing the plastic locking clips at the bottom of the box. Holding the handles, lift the upper section of the box. Place the six foam pieces and documents aside.
Tip: The rest of the boxes will be removed during the installation of the Air Manager.
![]() |
![]() |
|
Note: The Bowden tube should be in front of the print head cable. |
![]() |
![]() |
|
|
![]() |
![]() |
|
|
![]() |
Note: Ensure the hinges are fully inserted. If necessary, open the cover and push on each until you hear it click into place. |
|
Connections
Finally, connect all the cables to complete the installation of the Ultimaker S5 Pro Bundle. You will need the short white Material Station cable, the longer white Air Manager cable, the power extension cable, and the power cable.
Tip: The cable connections of the Ultimaker S5 Pro Bundle are different compared to the Ultimaker S5 as a standalone printer, or when combined with only one of its peripherals. The following steps explain how to connect the complete Ultimaker S5 Pro Bundle.
![]() |
![]() |
|
|
![]() |
![]() |
|
|
![]() |
![]() |
Note: The cable clips that come with the Air Manager are not used in the Pro Bundle. |
|
![]() |
![]() |
|
|
Connection overview:
![]() |
1. Air Manager cable The cable for the Air Manager must be securely connected to the bottom of the Air Manager and to the UMB OUT port of the Material Station. The cable can be secured behind the clips on the back panel of the Ultimaker S5. |
2. Material Station cable The Material Station cable runs between the UMB IN port of the Material Station and the UMB OUT port of the Ultimaker S5. |
|
3. Decoupler Bowden tubes Ensure that the Bowden tubes are inserted into their respective feeders and secured with the clamp clip. The Bowden tubes must not be secured to each other or any cables. They should be able to move freely. |
|
4. Power cable The power extension cable is connected between the Material Station and the Ultimaker S5. The power cable that was included with the printer is connected to the Material Station and a (wall) socket. |
Caution: A mains socket with protective earth/ground terminal must be used. Make sure that the building installation has dedicated means of over-current and short-circuit protection.
Note: The Material Station will automatically power on when power is supplied. This way the humidity can be continuously controlled while the door is closed.
Your Ultimaker S5 Pro Bundle is now fully assembled and connected, and ready for first use! Turn on the printer using the power switch at the back. The printer will guide you through the welcome setup via instructions on the display.
Comments
Please sign in to leave a comment.