To keep your Removal station in optimal condition, we recommend the following maintenance schedule, based on 2,000 operating hours per year:
Every month (or every water exchange) |
Every 3 months (or every 500 operating hours) |
Refresh the water | Check for play on the rotor bearings |
Clean the PVA Removal Station | Check the rotor bearing ring |
Check for damage | Remove limescale |
Click the links in the table above for detailed instructions on how to carry out the maintenance tasks.
Note: Maintenance actions shall only be performed by an adult. Carefully follow the provided instructions. Always turn off the PVA Removal Station and disconnect the power cable when performing maintenance actions, unless specified otherwise.
Comments
Please sign in to leave a comment.