The lead screw is connected to the Z motor and controls the movements of the Z stage. To ensure smooth movement of the Z stage, it is recommended to periodically apply Magnalube to the lead screw.
Over time, the Magnalube may need to be reapplied to maintain consistent and accurate movement of the Z stage. Do this once every three months. A tube of Magnalube is included in the accessory box of the Ultimaker 2+.
Lubricate the lead screw
- Make sure that the build plate is positioned at the bottom of the Ultimaker 2+
- Apply a small amount of Magnalube to the lead screw of the Z motor
- In the Ultimaker menu, navigate to Maintenance > Advanced
- Select “Raise build plate” and then “Lower build plate” to move the build plate up and down to evenly distribute the Magnalube
Comments
Article is closed for comments.